Full Size

Plunge Pools

The Macquarie 3.6  (New)

Baltic

  • Diameter: 3.6m water (4.1m total)
  • Depth: 1.55m water
  • 100%  Australian made
  • Imported stone coping
  • Designer Beadcrete (with waterline tile):
    $29,500 plus installation

Get Total Cost Estimate


The Panama 2.5  (New)

Baltic

  • Diameter: 2.5m water (3m total)
  • Depth: 1.55m water
  • 100%  Australian made
  • Imported stone coping
  • Designer Beadcrete (with waterline tile):
    $25,500 plus installation

Get Total Cost Estimate


Inclusions

All pools include:

  • Swim bench (customisable depth and step feature)
  • Premium fully-tiled Spanish tile interior or Designer Beadcrete with waterline tile
  • Imported stone coping
  • High quality, heat pump-compatible filtration system (see options below)
  • 10 yr guarantee on finishes (see below)

See all inclusions. Applicable to all pool designs.

  1. High strength 40mpa steel-reinforced structure
  2. Two component, highly flexible cementitious mortar waterproofing to pool interior
  3. High performance deformable cementitious mortar for glass mosaic tiles
  4. Spanish made glass mosaic tiles or Designer Beadcrete to suit your aesthetic needs (see options below)
    Note: Certain tile options are at additional cost (see below)
  5. Mapei Ultracolour plus grout for Spanish glass mosaic tiles
  6. A choice of natural stone 30mm thick coping pavers supplied through Newtech Stone & Marble and Artisan Stone
  7. Aquaquip Evo-max LED pool light with fitted transformer
  8. 4 x PVC filtration returns to pool interior
  9. Warterco skimmer box (built in situ to pool shell)
  10. Quality filtration system (see options below)
  11. Henden Handover kit
  12. Chemical startup Kit
  13. 10 year guarantee on finishes (tiling and coping) and 5 year guarantee on everything else

Installation Process

See the installation process. Completed within 72 hrs.

Note: Before install by your installation contractor, you need building approval. This can take from 24hrs to weeks. For more info, read our 'Do I need building approval?' FAQ.

Site Preparation: 

  • Excavation
  • Installation of footings/subbase system
  • Clear access for the delivery vehicle and designated crane size (Council permits may be required)

Craning:

  • Lifting and placement of the pool
  • Levelling and backfilling
  • Filling with water (permits may be required due to water restrictions, if applicable at the time)

Plumbing & Commissioning:

  • Running all pipework from the pool to the plant room
  • Fitting off the pool filtration and pump system
  • Commissioning the pool using chemicals and water testing supplied by Reece Irrigation & Pools


Price Estimator (incl. Installation)